Commercial

Large-Scale HydroPlanter & SuDS Installation in Liverpool

Almost 59m of HydroPlanter Max with SuDS Pods, drainage and landscaping in a major Liverpool SuDS retrofit.

Almost 59m of HydroPlanter Max with SuDS Pods, drainage and landscaping in a major Liverpool SuDS retrofit.

Sustainable Garden Solutions delivered a substantial commercial SuDS installation in Liverpool, integrating extensive HydroPlanter systems, roof-water management and landscaping across a large operational site.

At the heart of the scheme were 58.8 linear metres of HydroPlanter Max across three separate runs, complemented by ten SuDS Pods, drainage connections, flow-control infrastructure, planting, landscape edging and surface reinstatement. Existing underground services and the demands of a live site were carefully managed throughout the programme.

The result is significant new planted SuDS infrastructure supporting surface-water management, biodiversity and urban greening, a strong example of SGS's capacity to resource and deliver larger-scale sustainable drainage projects across Liverpool and the North West.

A close-up of a ladybug resting on sandy ground, with green grass blurred in the background.

Ready to work together?

A close-up of a ladybug resting on sandy ground, with green grass blurred in the background.

Ready to work together?