SuDS Tree Pit & HydroPlanter Installation in Bebington

Sustainable Garden Solutions delivered a significant SuDS and sustainable landscaping installation in Bebington, Wirral, combining extensive planted drainage infrastructure with a specialist structural tree-pit system.
The project incorporated 54.8 linear metres of HydroPlanter Max across three runs, below-ground attenuation, commercial ACO drainage and a RootSpace SuDS tree pit, completed with integrated tree-pit and seating features. Challenging existing ground conditions and live-site restrictions called for careful coordination and adaptable sequencing throughout the works.
By bringing together urban tree infrastructure, sustainable drainage, attenuation and planted landscape systems, the completed project shows SGS's ability to deliver complex commercial SuDS schemes from groundworks through installation and landscape completion.